Heat pumps › Planning and cooling

Heat pumps

Air-to-air heat pumps: planning permission, noise and cooling costs

Since May 2025, most air-to-air heat pumps on houses in England don't need planning permission, including ones that also cool. Here are the conditions, what's different for plain air conditioning, and what cooling costs to run in summer.

Checked against the planning law (legislation.gov.uk), council guidance and the Welsh Government on 25 November 2026.

The short answer

In England, an air-to-air heat pump that heats your home, and can also cool it, counts as "permitted development" if it meets every condition below. A unit used only for cooling, which is plain air conditioning, isn't covered, so check with your council first.

The conditions in England

Wales updated its rules on 1 June 2026. A unit for heating, or heating and cooling, can be permitted development, but not one for cooling only. Scotland and Northern Ireland have their own rules, so check with your council.

What cooling costs to run

Running cost is simple: the power the unit draws (in kilowatts) multiplied by the hours it runs, multiplied by your electricity price. Single-room split units are often rated somewhere between 0.8 kW and 2.5 kW. Modern units slow down once the room is cool, so they usually draw less than their rating.

Power drawnPer hour at 32.69p6 hours a day for 30 days
0.8 kW26.2p£47.07
1.5 kW49.0p£88.26
2.5 kW81.7p£147.10

For your own figures, use our running cost calculator with the "power input (cooling)" from the unit's specification. To compare heating costs with your current system, and check the £2,500 grant, use the air-to-air heat pump calculator.

Questions people ask

Do I need planning permission for air conditioning?

For a unit that only cools, permitted development doesn't apply, so check with your council. A heat pump that heats and can also cool is covered, as long as it meets all the conditions.

Can the outdoor unit go right next to my fence?

In England, yes. The old rule that it had to be at least 1 metre from the boundary was removed on 29 May 2025. It still has to pass the noise check.

Can I have more than one outdoor unit?

On a detached house, up to two can be permitted development. On other houses and blocks of flats, only one.

I live in a flat. Does this apply to me?

Blocks of flats have tighter limits, including a smaller maximum unit size, and you'll usually need permission from your freeholder or managing agent too.

Sources

General information, not planning advice. Spotted something out of date? Email hello@wattpays.co.uk.